Image shown is a representation only. Exact specifications should be obtained from the product data sheet.
Red Lion Controls
Manufacturer Part #:
TCU10307
Manufacturer:
Package:
-
Datasheet:
-
Description:
CONTROL TEMP ANALOG OUT 115/230V
For any specific requests regarding price, qty, ect. please send an RFQ.
Mfr | Red Lion Controls |
Type | Temperature Controller (RTD, Type B, E, J, K, N, R, S, T) |
Series | TCU |
Weight | 1.3 lbs (589.7 g) |
Package | Box |
Features | - |
Input Range | -200°C ~ 1820°C, -5 ~ 56mV |
Output Type | Analog, Option Cards Available |
Display Type | LED - Dual Color Characters |
Mounting Type | Panel Mount |
Communications | RS-485 |
Control Method | On/Off, Proportional (PID) |
Product Status | Obsolete |
Voltage - Supply | 115/230VAC |
Termination Style | Screw Terminal |
Ingress Protection | IP65 - Dust Tight, Water Resistant |
Operating Temperature | 0°C ~ 50°C |
Panel Cutout Dimensions | Rectangular - 92.00mm x 45.00mm |
Display Characters - Height | 0.401" (10.20mm), 0.299" (7.60mm) |
Number of Characters Per Row | 4, 4 |
For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer.
It is recommended to request for quotations to get the latest prices and inventories about the part.
Our sales will reply to your request by email within 24 hours.
1. You'll receive an order information email in your inbox. (Please remember to check the spam folder if you didn't hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)
The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and country.
Currently, our products are shipped through DHL, FedEx, SF, and UPS.
Once the goods are shipped, estimated delivery time depends on the shipping methods you chose:
FedEx International, 5-7 business days.
The following are some common countries' logistic time.
connectors
2024-03-26 311
Basic knowledge of crystal vibration, circuit design, non-vibration reasons, circuit principle, crystal frequency, digital circuit application (crystal vibration data download)
2024-02-26 350
Order transfer! A 30-year old Hong Kong-owned PCB factory in Shenzhen was sold
2024-01-25 329
Renesas Acquires Transphorm for $339 Million to Accelerate Gallium Nitride Market Expansion
2024-01-25 306